Prepare your initial
maintenance schedule.
Add what’s in the building, fill in what you know, and download the official NSW Excel form.
- No account needed
- Save and return later
Your building
Start with the building. You can come back to anything you don’t know yet.
Opening your draft…
Answers save in this browser until you choose Save & resume later. Anyone using this browser may be able to see the draft.
SimpliStrata · IMS supporting report
SIMPLISTRATA | INITIAL MAINTENANCE SCHEDULE SUPPORTING REPORT Prepared: 15 Nov 2026 Schedule date: To confirm This report accompanies the filled NSW standard Excel form. Professional review and any required certification remain outstanding until arranged. Project: To confirm Strata plan: To confirm Original owner: To confirm Lots: To confirm Purpose: new Storeys above ground: unknown Vertically stacked lots: unknown First AGM: To confirm Handover deadline: Confirm the first AGM date; allow at least 14 days Confirm whether certification applies The extra certification rule concerns new schemes with three or more storeys above ground and lots one above another. Confirm the building configuration and whether this is the initial handover before relying on the result. ASSET MAINTENANCE AND INSPECTION REGISTER No assets listed. Inspect the common property and complete the register. HANDOVER RECORDS To confirm — Completed NSW standard IMS form reviewed To confirm — Warranties for scheduled systems and equipment To confirm — Manufacturer manuals and maintenance requirements To confirm — Manufacturer and installer names and contact details To confirm — Independent surveyor's review and IMS certification evidence To confirm — Initial levy estimates and surveyor's certification evidence To confirm — Evidence of the surveyor's qualifications and independence FORM PREPARATION GAPS scheme address plan number schedule date at least one assessed asset review the structural components section review the exterior materials and finishes section review the doors and windows section review the roofing section review the interior materials and finishes section review the electrical system section review the plumbing system section review the heating, ventilation and air conditioning (hvac) section review the fire safety systems section review the elevators, escalators and travelators section review the technology and communication section review the accessibility infrastructure section review the landscaping and exterior elements section review the amenities and facilities section review the furnishings and fixtures section review the car parking area components section review the waterproofing systems section NEXT STEPS Check all common-property assets; split equipment into separate entries where intervals or per-activity costs differ. Use manufacturer instructions, the fire safety schedule and qualified advice to confirm task details and intervals. Suggested task wording is only a starting point. Include the actual warranties, manuals, maintenance requirements and manufacturer/installer contact details. The supporting report contains references only; include the actual files in the handover pack. Review the filled NSW standard Excel form, all fields marked To confirm, the attachments and the initial levy estimates. Downloading the form does not certify it. For a new multi-storey scheme, check independence and the required designation: AIQS member and Certified Quantity Surveyor, or RICS member and Chartered Quantity Surveyor. Use the IMS to inform the first 10-year capital works fund plan; that is a separate document. Keep evidence of what was delivered to the owners corporation and when. This checklist is IMS-focused, not the complete first-AGM handover list. OFFICIAL SOURCES https://www.nsw.gov.au/housing-and-construction/strata/guide-to-strata-law-changes-for-strata-committees-and-owners https://www.nsw.gov.au/housing-and-construction/strata/factsheets-forms-resources/initial-maintenance-schedule-strata https://legislation.nsw.gov.au/view/html/inforce/current/sl-2016-0501#sec.29
About the form and NSW requirements
What is an initial maintenance schedule?
An initial maintenance schedule (IMS) sets out the maintenance and inspections needed for a new strata scheme's common property. It includes supporting warranties, manufacturer instructions and manufacturer and installer contact details. The developer gives it to the owners corporation as part of handover.
What are the NSW initial maintenance schedule requirements?
The original owner must prepare the IMS using the NSW standard form and give it to the owners corporation at least 14 days before the first AGM. Since 1 April 2026, new multi-storey schemes also have independent review and certification requirements for the IMS and initial levy estimates. Check the current NSW guidance for your scheme.
Who can certify an initial maintenance schedule?
For a new multi-storey NSW scheme, the reviewer must be independent of the original owner and be either an Australian Institute of Quantity Surveyors member with the Certified Quantity Surveyor designation, or a Royal Institution of Chartered Surveyors member who is a Chartered Quantity Surveyor. The NSW guide explains the connections that affect independence.
Does a two-storey townhouse development need certification?
The additional multi-storey certification rule concerns schemes with three or more storeys above ground and lots vertically stacked. A new scheme outside that definition still needs an IMS using the standard form and must meet the handover requirements. Confirm the configuration with your adviser.
Does this complete the government form?
Yes. The tool fills the supplied NSW standard Excel form FT6648 from your answers, preserving its instructions, item labels and definitions. The handover ZIP can include your selected manuals, warranties and other documents. Unanswered fields remain To confirm. Downloading the form does not certify it or deliver it to the owners corporation; arrange any required independent review and give the records to the owners corporation.
Can I save this and come back another day?
Yes. Choose Save & resume later and enter your email. We save your answers and editing position and email a private link. After the first save, changes sync automatically. The link works on another device and stays valid for 90 days after your last save. Supporting files need to be reattached; their references remain in the draft. Anyone with the link can edit the draft, so keep it private.
When do I need to provide my email?
Build and review your schedule without an account. On the last step, provide your email to access the filled Excel form or form-and-documents ZIP. We save your email, the property and schedule answers you entered, and selected-document details with the submission. Supporting file contents stay in your browser. Marketing updates are a separate optional choice.
Guidance checked 15 November 2026. Professional review and any required certification remain part of handover.